|
LTC performed Techno-Economic Study & Selection of gas boosters (145 MMSCFD) for depleting wells, adequacy checks of existing facilities at low arrival pressure and revamp design activities for suggested modifications. Assistance provided for smooth pre-commissioning & commissioning activities. LTC performed Basic Design for Slip Stream Heating & Upgradation of ALHF while minimizing modifications in the existing facilities. This involves scheme conceptualization, simulation, PFD preparation and equipment sizing as major activities.
|