The objective of the revamp was to augment the capacity (from 3 MMTPA to 7 MMTPA) while maximizing Heat Recovery through efficient Heat Exchanger Networking. IOCL also desired to have additional draw offs for Kerosene and Gas Oil Cuts from the existing Atmospheric Column while utilizing existing equipment (Columns, Exchangers, Pumps, etc…) as much as possible.
LTC was responsible for carrying out Process Simulation, Basic Design and Preparation of Basic Engineering Package for the Revamp Unit in line with above objectives.
|