LTC was responsible for residual process engineering, detailed engineering and procurement assistance for Isomerisation Project comprising of Light Naphtha Hydrotreating unit (0.7 MMTPA), Benzene Saturation Unit (0.5 MMTPA) and PENEX / DIH Unit (0.5 MMTPA).
The detailed engineering was executed through 3D modeling. LTC also provided assistance during pre-commissioning & commissioning for smooth start up of the entire Isomerisation Block. Project completed within stiff schedule stipulated by owner.
|