This LNG Plant has 2 identical trains (Train-6 & 7), each with plant capacity of 7.8 MMTPA LNG, which would be one of largest LNG production plant in World.
LTC was responsible for the Front End Engineering and Design of following Units:
1. Condensate Treating Unit (MERICHEM Unit)
2. Acid Gas Removal Unit (AGR)
3. Dehydration and Regeneration Gas Treating Unit
4. LPG Treating Unit