|
Complete engineering services were
executed for incorporating a urea
hydrolyser system in the existing
Urea Plant. Through various engineering
studies, optimum locations of equipment
were arrived at, so as to minimize
modification of the existing structure
& piping while keeping in mind
the contractibility aspects.
|